Grin logo
en de es fr
Shop
GRIN Website
Publicación mundial de textos académicos
Go to shop › Política - Región: Centro y Sur América

Power and the Xingú: Policy Proposals on the Construction of the Belo Monte Dam

Título: Power and the Xingú: Policy Proposals on the Construction of the Belo Monte Dam

Trabajo Escrito , 2012 , 10 Páginas , Calificación: A

Autor:in: Tim Pfefferle (Autor)

Política - Región: Centro y Sur América
Extracto de texto & Detalles   Leer eBook
Resumen Extracto de texto Detalles

This paper provides policy options with regard to the construction of the Belo Monte dam, a large hydroelectric project in the Amazon which is supposed to add significant capacity to the Brazilian energy grid. The economic, social and environmental impacts are taken into account in assessing the viability of the project.

Extracto


Inhaltsverzeichnis (Table of Contents)

  • Introduction
  • Policy Options
    • Option A: Extensive Dam Construction
    • Policy Option B: Belo Monte as Single Site
    • Policy Option C: Energy Policy without Belo Monte

Zielsetzung und Themenschwerpunkte (Objectives and Key Themes)

This policy proposal examines the viability of constructing the Belo Monte hydroelectric dam in Pará, Brazil. The proposal argues that the dam will not achieve its intended results and will lead to unforeseen negative consequences. It suggests an alternative energy mix and contrasts it with the dam project.
  • The economic, environmental, and social implications of the Belo Monte dam
  • The challenges of reconciling economic growth with environmental protection in Brazil
  • The status of minority groups within a representative democracy
  • The impact of large-scale hydroelectric projects on indigenous communities
  • The viability of alternative energy sources in Brazil

Zusammenfassung der Kapitel (Chapter Summaries)

  • Introduction: Introduces the proposal and the main argument against the construction of the Belo Monte dam. Highlights the dam's potential negative impact on the environment, indigenous communities, and Brazil's institutional structure.
  • Policy Option A: Extensive Dam Construction: Argues that the construction of the Belo Monte dam, along with other upstream dams, will be driven by a desire for sustained economic growth and energy security. However, it raises concerns about the environmental and social costs of such a large-scale project.
  • Policy Option B: Belo Monte as Single Site: Presents a compromise option that acknowledges the potential economic viability of the Belo Monte dam as a single entity. However, it emphasizes the need to consider the significant environmental impact and the potential for the dam to become a "white elephant."
  • Policy Option C: Energy Policy without Belo Monte: Advocates for the complete abandonment of the Belo Monte project, highlighting the questionable economic benefits, the serious environmental consequences, and the potential social and institutional impacts.

Schlüsselwörter (Keywords)

The main keywords and focus topics of this text include hydroelectric dams, sustainable development, environmental protection, indigenous rights, energy policy, and the Belo Monte dam in Brazil. The text explores the complex challenges of balancing economic growth with social and environmental concerns.
Final del extracto de 10 páginas  - subir

Detalles

Título
Power and the Xingú: Policy Proposals on the Construction of the Belo Monte Dam
Universidad
University of Miami  (Department of International Studies)
Curso
Latin American Democratization
Calificación
A
Autor
Tim Pfefferle (Autor)
Año de publicación
2012
Páginas
10
No. de catálogo
V232450
ISBN (Ebook)
9783656489252
ISBN (Libro)
9783656492795
Idioma
Inglés
Etiqueta
power xingú policy proposals construction belo monte
Seguridad del producto
GRIN Publishing Ltd.
Citar trabajo
Tim Pfefferle (Autor), 2012, Power and the Xingú: Policy Proposals on the Construction of the Belo Monte Dam, Múnich, GRIN Verlag, https://www.grin.com/document/232450
Leer eBook
  • Si ve este mensaje, la imagen no pudo ser cargada y visualizada.
  • Si ve este mensaje, la imagen no pudo ser cargada y visualizada.
  • Si ve este mensaje, la imagen no pudo ser cargada y visualizada.
  • Si ve este mensaje, la imagen no pudo ser cargada y visualizada.
  • Si ve este mensaje, la imagen no pudo ser cargada y visualizada.
  • Si ve este mensaje, la imagen no pudo ser cargada y visualizada.
Extracto de  10  Páginas
Grin logo
  • Grin.com
  • Page::Footer::PaymentAndShipping
  • Contacto
  • Privacidad
  • Aviso legal
  • Imprint