Extrait
Table of Contents
List of figures
List of tables
List of abbreviations
1 Introduction
1.1 Problem of the thesis
1.2 Aims of the thesis
1.3 Methodological Framework
2 Literature Review
2.1 Background and Definitions
2.2 Overview of Due Date Performance Measures
2.2.1 Output Lateness, Absolute Lateness, Squared Lateness and Tardiness
2.2.2 Relative Lateness
2.2.3 Binary Lateness and Schedule Unreliability
2.3 Classification Approach
3 Methodology
3.1 Data Overview & Data Cleaning
3.2 Lateness Computations
3.3 Interrelationship Analysis
4 Findings
4.1 Lateness Computations
4.2 Interrelationship Analysis
5 Discussion
6 Final Consideration
6.1 Results and critical reflections
6.2 Implications for further research
6.3 Implications for practice
Table of references
Appendix
- Citation du texte
- Ricarda Schäfer (Auteur), 2016, What is Really "On-Time"? A Comparison of Due Date Performance Indicators in Production, Munich, GRIN Verlag, https://www.grin.com/document/370576
Devenir un auteur
Commentaires