Euro Disneyland. A Cost Benefit Approach


Travail de Recherche, 2018

24 Pages, Note: A


Extrait


Table of Contents

Introduction
The Project
The 1987 Convention
Literature Review

Calculation of the benefits of Euro Disney
The Benefits Included in the Analysis
The Benefits not Included in the Analysis

Calculation of the Costs of Euro Disney
The Costs Included in the Analysis
An Estimation of the Environmental Costs of Disneyland Paris
The Cost not Included in the Analysis

Final Results of the Analysis
Did the French government really benefited?
The impact of the failure

Conclusion

Bibliography

Annex 1: Structure of the Euro Disneyland Project

Annex 2: French Minimum Wage Table

Annex 3: Estimate of the Benefit

Annex 4: Attendance

Annex 5: Total Benefit with adjusted for created tourism

Annex 6: Estimate of the Costs

Annex 6: Estimate of the Environmental costs

Fin de l'extrait de 24 pages

Résumé des informations

Titre
Euro Disneyland. A Cost Benefit Approach
Université
The George Washington University  (Trachtenberg School of Public Policy and Public Administration)
Cours
Cost-Benefit Analysis
Note
A
Auteur
Année
2018
Pages
24
N° de catalogue
V465022
ISBN (ebook)
9783668944053
ISBN (Livre)
9783668944060
Langue
anglais
Mots clés
Public Finance, Economics, Disney, Disneyland Paris, France, Cost benefit analysis
Citation du texte
Alexandre Aubard (Auteur), 2018, Euro Disneyland. A Cost Benefit Approach, Munich, GRIN Verlag, https://www.grin.com/document/465022

Commentaires

  • Pas encore de commentaires.
Lire l'ebook
Titre: Euro Disneyland. A Cost Benefit Approach



Télécharger textes

Votre devoir / mémoire:

- Publication en tant qu'eBook et livre
- Honoraires élevés sur les ventes
- Pour vous complètement gratuit - avec ISBN
- Cela dure que 5 minutes
- Chaque œuvre trouve des lecteurs

Devenir un auteur