Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2

Presentacion final de estadía


Internship Report, 2017

6 Pages, Grade: ninguna


Abstract or Introduction

This article talks about the documentation required by CQI-12, the main documents that must be in a new plant are: AMEF, control plan, flow chart and procedures for plant management. This standard also evaluates the physical aspects of the plant, such as: signaling, identification of valves, processes, etc. The purpose of this document is to show people who do not know this type of rules, the activities that are performed to meet customer requirements through parameters that have already been reviewed and checked by paint experts who share this information to ensure the Quality of the part coating.

Details

Title
Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2
Subtitle
Presentacion final de estadía
College
Polytechnic University of Aguascalientes
Grade
ninguna
Authors
Year
2017
Pages
6
Catalog Number
V374551
ISBN (eBook)
9783668542358
File size
2872 KB
Language
Spanish; Castilian
Keywords
CQI-12, FMEA, Control Plan, Flow Chart, Procedures, Safety signs
Quote paper
Alejandra Martinez Davila (Author)Jesús Reyes Amador (Author)Carlos Andrés Mesa Jaramillo (Author), 2017, Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2, Munich, GRIN Verlag, https://www.grin.com/document/374551

Comments

  • No comments yet.
Look inside the ebook
Title: Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2



Upload papers

Your term paper / thesis:

- Publication as eBook and book
- High royalties for the sales
- Completely free - with ISBN
- It only takes five minutes
- Every paper finds readers

Publish now - it's free