Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2

Presentacion final de estadía


Rapport de Stage, 2017

6 Pages, Note: ninguna


Résumé ou Introduction

This article talks about the documentation required by CQI-12, the main documents that must be in a new plant are: AMEF, control plan, flow chart and procedures for plant management. This standard also evaluates the physical aspects of the plant, such as: signaling, identification of valves, processes, etc. The purpose of this document is to show people who do not know this type of rules, the activities that are performed to meet customer requirements through parameters that have already been reviewed and checked by paint experts who share this information to ensure the Quality of the part coating.

Résumé des informations

Titre
Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2
Sous-titre
Presentacion final de estadía
Université
Polytechnic University of Aguascalientes
Note
ninguna
Auteurs
Année
2017
Pages
6
N° de catalogue
V374551
ISBN (ebook)
9783668542358
Taille d'un fichier
2872 KB
Langue
espagnol; castillan
Mots clés
CQI-12, FMEA, Control Plan, Flow Chart, Procedures, Safety signs
Citation du texte
Alejandra Martinez Davila (Auteur)Jesús Reyes Amador (Auteur)Carlos Andrés Mesa Jaramillo (Auteur), 2017, Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2, Munich, GRIN Verlag, https://www.grin.com/document/374551

Commentaires

  • Pas encore de commentaires.
Lire l'ebook
Titre: Seguimiento de auditoría CQI-12 y elaboración de documentación de planta pintura 2



Télécharger textes

Votre devoir / mémoire:

- Publication en tant qu'eBook et livre
- Honoraires élevés sur les ventes
- Pour vous complètement gratuit - avec ISBN
- Cela dure que 5 minutes
- Chaque œuvre trouve des lecteurs

Devenir un auteur